3/4/5-Room 2-Toilets Resale Package (Standard)

$11,900.00

We have crafted this package for homeowners that are looking to completely revamp the 2 toilets of their resale flat. Owning a resale flat, it usually means having to spend more on renovation. And after spending some time studying the industry, we discovered that while there are renovation packages for the 2 toilets. These packages only include the hacking and tiling works.

Some parts of the works have been left out to make the package look cheaper. For example, the plumbing and toilet door can add up to a substantial amount when added together with the sanitary fittings. This is one of the reasons why our packages are at this price point.

It is definitely one of the most comprehensive packages for the kitchen and 2 toilet resale flats that you can get in the market.

It’s standard tier means that you get to choose from a wide range of market standard selection of tiles. And the sanitary included has also been pre chosen for you from top tier quality, which can be upgraded or taken out at your request.

As with all renovation packages, we try to include as much as we possibly can into the package. But the intricate nature of Renovation means that we can never completely include everything.

This is why we will work together with you to understand your needs more with the space that you had selected.

This action will let you pay a deposit of $1,190.00 for this product
View cart

Description

Professional Services
Project Management
On-Site Supervision
Materials selection and consultation

A Hacking Works
1 To supply labor & tools to hack 2 toilets floor and wall tiles only
– sanitary fittings and piping
– door

B Masonry Works (tiles up to $3.00 per sqft or lower inclusive of GST)
1 To supply labor & materials to lay waterproofing membrane at 2 toilets only
2 To supply labor & materials to lay common toilet floor and wall tiles only
– up to 250sqft
3 To supply labor & materials to lay master toilet floor and wall tiles only
– up to 250sqft
* tiles size 300×300, 300×600 and 600×600
* smaller and bigger tiles size will incurr additional labor of est. $300.00 per toilet
* tiles wastage for above will be dependant on type of tiles and chosen layout
* waterproofing for toilets inclusive of non-shrink grout, Adseal 104 and waterproof screed
* drop kerb for both toilets shower area unless cannot be done

C Plumbing Works
1 To supply labor & materials to install cold stainless steel piping for 2 toilets only
2 To supply labor & materials to install WC only 2 nos.
3 To supply labor & materials to install bidet only 2 sets
4 To supply labor & materials to install basin+tap only 2 sets
5 To supply labor & materials to install instant heater set+2way tap only 2 sets
* FREE installation of all toilet accessories

D Electrical Works
1 To supply labor & materials to reinstate electrical at 2 toilets only
– installation of 2 toilets ceiling light 2 nos.
– 2 toilets water heater switch
– connection for instant heater switch 2 nos.

E Metal, Aluminum, Door and Glass Works
1 To supply & install PD slide and swing door only 2 nos.
– normal design

F Misc Works
1 To supply labor for haulage only
2 To supply labor & transport to clear all renovation debris only
3 To supply labor & materials for chemical wash after masonry works only
4 To supply labor & materials for general cleaning of work areas after all works only

FREE gifts of up to $1200
* FREE WC x 2nos.
* FREE bidet x 2sets
* FREE basin + tap x 2sets
* FREE instant heater set + 2way tap x 2 sets
* FREE painting of 2 toilets ceiling
– inclusive of PVC pipes
– sealer undercoat
– White only

Payment Terms:
10% of total contract amount upon confirmation of works.
40% of total contract amount 2 days before commencement of works.
30% of total contract amount upon completion of masonry works.
15% of total contract amount upon final measurement of carpentry works.
5% of total contract amount upon completion of all works.