Premium 3-Room Kitchen Cabinet BTO Package

$6,590.00

We have created this package specially for homeowners who like more choices for their kitchen cabinets. It’s premium tier means you get to choose from at least 5 colors for the internal of your kitchen cabinets. Have more choices for kitchen worktop and laminate design. The hood and hob included has been pre chosen for you from Fujioh.

As with all renovation packages, we try to include as much as we possibly can into the package. But the intricate nature of Renovation means that we can never completely include everything.
This is why we will work together with you to understand your needs more with the package that you have chosen.

Categories: ,
This action will let you pay a deposit of $659.00 for this product
View cart

Description

Professional Services
Project Management
On-Site Supervision
Materials selection and consultation
3D rendering when needed

Carpentry Works
To fabricate & install kitchen top and bottom cabinet 20ft with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $80.00 only
To supply & install kitchen worktop 10ft Quartz up to *Tier 2 (20mm, single profile) or Kompac plus only
To fabricate & install waterproofing board with 304 stainless steel hinges 4pcs for kitchen sink area up to 3ft only
*all kitchen carpentry c/w 304 stainless steel 2 tier dish drainer w/ optional push up glass/laminate door

Masonry Works
To construct concrete base 10ft with *tiles finish (*tiles not included)

Electrical Works
To hack tiles for running of wire for double point & hood
To supply & install 1x double point, 1x single point(fridge) and 1x hood point

Misc Works
To supply & install glass backing 10ft
To supply & install designer sink w/ sponge and dish basket and tap complete with inlet/outlet
To supply & install hood and hob Fujioh

Payment Terms:
10% of total contract amount upon confirmation of works.
40% of total contract amount 2 days before commencement of works.
30% of total contract amount upon completion of masonry works.
15% of total contract amount upon final measurement of carpentry works.
5% of total contract amount upon completion of all works.