Standard 3-Room BTO Whole House Package

$21,670.00

This package is created for BTO owners that have opted for a bare unit. And are looking for practical works that they will need.

It’s standard tier means that you get to choose market standard quartz, laminate and tiles design.

There are no sanitary fittings included except for the kitchen sink+tap only. Although you don’t have to worry about installation, as all labor has been included.

As with all renovation packages, we try to include as much as we possibly can into the package. But the intricate nature of Renovation means that we can never completely include everything.

This is why we will work together with you to understand your needs more with the space that you had selected.

Categories: ,
This action will let you pay a deposit of $2,167.00 for this product
View cart

Description

Professional Services
Project Management
On-Site Supervision
Materials selection and consultation
3D rendering when needed

Masonry Works
To supply & lay tiles at living, dining and 2 bedrooms
To construct 2 nos kerb for 2 toilets only
To construct concrete base for kitchen cabinet only 10ft
* Tiles can be chosen up to $3.30 per sqft or lower

Carpentry Works
To design, fabricate & install kitchen cabinet 10ft top with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $60.00 only
To design, fabricate & install kitchen cabinet 10ft bottom with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $60.00 only
To fabricate & install waterproofing board with 304 stainless steel hinges 4pcs for kitchen sink area up to 3ft only
To supply & install kitchen worktop 10ft Quartz *Tier 1(20mm, single profile) or Kompac plus only
To design, fabricate & install casement wardrobe at master 8ft with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $60.00 only
To design, fabricate & install sliding wardrobe at common room 5ft with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $60.00 only
To design, fabricate & install feature wall 6ft by 8.5ft with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $60.00 only
To design, fabricate & install tv console 6ft c/w front glass for 2 doors with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $60.00 only
* All carpentry c/w solid ply, internal white carcass, ABS door trimmings, soft closing hinges and selected laminate finish up to $60.00, 2 tier s/s dish drainer, cutlery tray & 3 drawers for kitchen cabinet only

Electrical Works
To provide tiles hacking for relocate & concealed electrical points at kitchen only inclusive of make good tiles, tiles provided by owner
To supply labor & materials to install all lights and fans, not inclusive for L-box if any
– relocate of switches & light points will be charged by per point
To relocate electrical points into tv console, on same side wall only
– 2 double points & 1 data point
To relocate electrical points for tv console, on same side wall only

Window Works
To supply & install sliding window for service yard only

Painting Works
To supply labor & materials to paint whole house including paint vinilex 5000 up to 3 colors
No painting of any doors or door frames

Misc Works
To provide haulage for materials, tiles, cement and rubbish 2 times
To supply labor & materials to install all sanitary fittings inclusive of sink + tap c/w inlet water pipe & pvc waste pipe
To supply designer sink single bowl c/w sponge basket + tap
To supply labor & materials to install storage heater tank
To supply labor & materials to clean house 2 times, after masonry works and final cleaning for handover
No doors for toilets
To provide floor protection while doing works, as & when needed
To supply hood & hob from EF
To supply labor & materials to install hood and hob
To arrange & coordinate with citygas for the installation of gas pipe

Payment Terms:
10% of total contract amount upon confirmation of works.
40% of total contract amount 2 days before commencement of works.
30% of total contract amount upon completion of masonry works.
15% of total contract amount upon final measurement of carpentry works.
5% of total contract amount upon completion of all works.