Standard 4-Room BTO Whole House Vinyl Package

$25,240.00

This package is created for BTO owners that have opted for a bare unit. And are looking for practical works that they will need.

It’s standard tier means that you get to choose market standard quartz, laminate and tiles design.

There are no sanitary fittings included except for the kitchen sink+tap only. Although you don’t have to worry about installation, as all labor has been included.

As with all renovation packages, we try to include as much as we possibly can into the package. But the intricate nature of Renovation means that we can never completely include everything.

This is why we will work together with you to understand your needs more with the space that you had selected.

Categories: ,
This action will let you pay a deposit of $2,524.00 for this product
View cart

Description

Professional Services
Project Management
On-Site Supervision
Materials selection and consultation
3D rendering when needed

Carpentry Works
To fabricate & install kitchen top and bottom cabinet 30ft with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $55.00 and up to 3 drawers only
To fabricate & install 10ft casement wardrobe with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $55.00 and up to 3 drawers only
To fabricate & install 5ft casement wardrobe 2nos with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $55.00 and up to 3 drawers only
To fabricate & install 6ft TV console with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $55.00 only
To fabricate & install TV feature wall 6ft by 8.5ft with internal white carcass, ABS door trimmings, soft closing hinges, and selected laminate finish of up to $55.00 only
To fabricate & install waterproofing board with 304 stainless steel hinges 4pcs for kitchen sink area up to 3ft only
To supply & install kitchen worktop 10ft Quartz *Tier 1(20mm, single profile) or Kompac plus only
*all kitchen carpentry c/w 304 stainless steel 2 tier dish drainer w/ optional push up glass/laminate door

Masonry Works
To construct concrete base 10ft with *tiles finish (*tiles not included)
To construct shower kerb at 2 toilets (*tiles not included)
To supply & lay *tiles up to 3.30per sqft at Living and bedrooms

Window Works
To supply & install sliding window for service yard

Painting Works
To provide painting for whole house (doors not included)

Misc Works
To supply & install sink w/ sponge basket + tap complete with inlet/outlet
To supply & install hood and hob EF
To supply & install 1x double point, 1x single point(fridge) and 1x hood point
To provide labor for installing all toilet fittings
To provide chemical wash for whole house after masonry works
To provide paper & plastic covering while doing work
To provide daily housekeeping of work areas
To install lights & fans whole house

Payment Terms:
10% of total contract amount upon confirmation of works.
40% of total contract amount 2 days before commencement of works.
30% of total contract amount upon completion of masonry works.
15% of total contract amount upon final measurement of carpentry works.
5% of total contract amount upon completion of all works.